Wireline Control Systems
Wireline Control Systems provides a full spectrum of advanced equipment for all wireline pressure control applications. A focused commitment to safety and quality assures that each customer receives certified, reliable equipment delivering superior performance.

/ImageHandlers/WidgetImage.aspx?id=d4352238-7f35-4f59-885b-40905c6fbc93&type=GalleryPicture
Grease Injection Systems

 

WCS supplies a full line of grease injection systems for use in electricline and slickline operations. Grease injection systems contain wellhead fluids and pressure during wireline operations, and allow the wireline to pass through a close-tolerance tube assembly containing grease under high-pressure. Systems are available in 5,000 psi, 10,000 psi and 15,000 psi configurations.

 

Available Systems

 

  • 5 1/8” H2S 10,000 PSI WP
  • 5 1/8” Light Wt. 10,000 PSI WP
  • 6” 10,000 PSI WP
  • 6 7/8” H2S 10,000 PSI WP
  • 3 1/16” H2S 15,000 PSI WP
  • 4 1/16” H2S 15,000 PSI WP
  • 5” H2S 15,000 PSI WP
  • 5 1/8” 15,000 PSI WP
  • 2 1/2 5,000 PSI WP
  • 3 1/16” 5,000 PSI WP
  • 5 1/2 ” 5,000 PSI WP
  • 3 1/16” 10,000 PSI WP
  • 3 1/16” H2S 10,000 PSI WP
  • 4 1/16” 10,000 PSI WP
  • 4 1/16” Light Wt. H2S 10,000 PSI WP
  • 4 1/2” 10,000 PSI WP
  • 4 1/2” H2S 10,000 PSI WP

 

 

Open and Cased Hole Lubricator Systems

 

These systems are used to run logging tools into the well during drilling, after drilling and after running casing.

Available Systems:

  • Casing Lubricators
  • 5K Grease Injector with Dual Hydraulic System
  • Open Hole Dual Packoff System
  • Open Hole
  • Fishing

 

 

 

Lockdown Lubricator System

 

/ImageHandlers/WidgetImage.aspx?id=f53afaee-8de2-4dd1-8950-1ca01db494b8&type=GalleryPictureThe design of this tool provides a reliable seal and is anchored to the BOP without removing the rig’s bell nipple and mud monitoring system.

Eliminates rig down time for lubricator installation

Maximizes safety of rig personnel

Multiple options for attaching lubricator to bell nipple

Suitable for offshore and onshore applications

Reduces well exposure time between pipe tripping and open hole wireline operations

Protects annular BOP rubber seal from damage by the wireline cable

 

 

Wireline Side Entry System and Pipe Recovery System

 

This system allows well control maintenance during wireline operations.

Design keeps wireline a safe distance from the traveling blocks and drill line

Allows pumping and circulation any time during wireline operations

Permits wireline tools to be attached to the wireline at floor level

Wireline is wiped clean when pulled from the well, eliminating costly clean-up

Three tool styles provide maximum application flexibility

Tools can be deployed through the top or stripped through with a swivel

 

 

Locking Swivel

 

The mechanical locking swivel is placed ten feet below the top drive elevators. The wirelineis then able to clear the top drive assembly when entering or exiting the side entry sub.

Mechanical design for reliable locking and unlocking

Accommodates either a grease seal or hydraulic pack-off assembly

Connected to top drive, eliminating need for tongs

Allows greater range of movement to work torque in pipe